Secondary School Development
- Role
- Site Engineer — Galcon Engineering Limited
- Type
- New build — education, two storeys
- Involvement
- Start-to-finish delivery
Scope of involvement
- Supervised day-to-day construction activities
- Coordinated labour, materials, artisans and subcontractors
- Checked workmanship and progress across construction stages
- Kept site records and reporting current through delivery
A two-storey school block is a repetitive structure, which is an advantage only if the repetition is controlled. Setting-out, reinforcement and formwork had to be checked bay by bay so that errors were corrected at the first bay rather than repeated across the elevation.
The project ran from commencement to completion, with the structural frame, envelope and internal works sequenced so that follow-on trades always had a clear front.