Hilary Iloka Civil Engineer
Technical work

Documents, independent of the projects.

A working library — each document can stand alone or link to a project. Files are added and published individually.

5 sample entries below show the structure. Replace them with your own documents in the studio — nothing here is a claim of completed client work.

Type 5 documents
Bill of Quantities BOQ-RES-01 Sample

Bill of Quantities — Residential Building

Measured quantities, preliminaries and summary sheets for a residential building, prepared from the drawings and a defined method of measurement.

2 Oct 2026

No file attached
Programme & schedule PRG-SCH-02 Sample

Construction Programme — Two-Storey School Block

Activity sequence with durations and dependencies, structured for progress tracking against a baseline.

16 Oct 2026

No file attached
Method statement MS-ROOF-03 Sample

Method Statement — Curved Roof Steelwork

Sequence, plant, labour and controls for erecting and welding a curved steel roof, written to be followed on site.

28 Oct 2026

No file attached
Quantity take-off QTO-FIN-04 Sample

Quantity Take-off — Finishing Works

Room-by-room measurement of finishing works for pricing and procurement, with waste allowances stated separately.

4 Nov 2026

No file attached
Inspection report INS-05 Sample

Site Inspection Report

Recorded observations and defects with photographs, recommendations and a follow-up list for corrective action.

12 Nov 2026

No file attached
01What I prepare

Bills of Quantities

Measured quantities, preliminaries and summary sheets, built from the drawings and a stated method of measurement.

Construction programmes

Activity sequences, durations and dependencies, with progress tracked against the baseline.

Method statements

The sequence, plant, labour and controls for a specific operation, written to be followed on site.

Quantity take-offs

Measurement from drawings for pricing, procurement and valuation — including large-format take-offs in Bluebeam Revu.

Inspection & technical reports

Recorded observations, defects and compliance checks, with photographs and clear recommendations.

Site reports

Daily and weekly progress, labour, materials and issues, written for the client and consultant team.

Tender documentation

Project information, pricing schedules and supporting submissions prepared for review.

Client drawings and commercially sensitive documents are not published. Everything in the library is either prepared for public view or cleared for release.