Hilary Iloka Civil Engineer
All projects
Project 02 / 05

Residential Building Fire-Damage Renovation

Role
Site Engineer — Galcon Engineering Limited
Type
Renovation & rehabilitation
Involvement
Rehabilitation works

Scope of involvement

  • Removal of fire-damaged elements
  • Rebuilding and refurbishment works
  • Coordination of multiple trades and site resources
  • Sequencing works around a partially retained structure

Fire damage leaves a building that is partly sound and partly not, so the first task was establishing what could stay. Damaged elements were removed, the retained structure was protected, and the rebuild was sequenced around it.

The site was tight and the trades overlapped: structural repairs, blockwork, services and finishes all had to be coordinated in a space that offered no room for a second work front.