Hilary Iloka Civil Engineer
All projects
Project 05 / 05

One-Storey Hostel Demolition for NGO

Role
Site Engineer — Galcon Engineering Limited
Type
Demolition & site clearance
Involvement
Controlled demolition

Scope of involvement

  • Planned the demolition sequence
  • Coordinated labour and site activity
  • Controlled access and safety around the works
  • Managed removal and site clearance

Demolition is a sequencing problem before it is a labour problem. The structure was taken down in a controlled order, with access routes and exclusion zones set before work started and maintained throughout.

Clearance followed the demolition so the site was handed back clean rather than left with a spoil problem at the end.