One-Storey Hostel Demolition for NGO
- Role
- Site Engineer — Galcon Engineering Limited
- Type
- Demolition & site clearance
- Involvement
- Controlled demolition
Scope of involvement
- Planned the demolition sequence
- Coordinated labour and site activity
- Controlled access and safety around the works
- Managed removal and site clearance
Demolition is a sequencing problem before it is a labour problem. The structure was taken down in a controlled order, with access routes and exclusion zones set before work started and maintained throughout.
Clearance followed the demolition so the site was handed back clean rather than left with a spoil problem at the end.